• 02/14/2000 Power Failure on CCU. Replaced AQX Power supply.
  • 05/04/2000 Gradient Unit exchanged.
  • 04/08/2001 Shim stacks were taken out and cleaned
  • 12/10/2001 reenergized after quench
  • 07/24/2003 Cleaned out probe and bore and replaced probe insert after tube breakage
  • 05/05/2004 Replaced fan on preamplifier
  • 01/12/2005 Replace probe heater
  • 01/14/2005 Slow quech
  • 02/03/2005 Reenergize
  • 12/22/2006 Shim stacks were taken out and cleaned
  • 05/30/2007 QUENCH :-(
  • 7/23/2007 reenergized