11/13/1999 The x- and z- gradient amplifier modules have been repaired and are working again
03/03/2000 The matching problem on the BBO Probe has been fixed
01/30/2001 The BBI probe has been fixed
05/23/2001 BB X-F19 Preamplifier exchanged
05/30/2001 Proton base frequency reset to 500.05 MHz to account for magnet drift
10/03/2001 Reenergized magnet after quench. Base frequency back at 500.13 MHz
12/22/2001 The BBI probe has been fixed
08/23/2002 Fuses for SCB were replaced
11/19/2003 Replaced liquid He sensor probe
01/07/2004 Lubricated fans for BLAH and BLAX transmitters
03/18/2004 Exchanged fan for BLAX transmitter of Y channel
10/03/2004 Changed base frequency to 500.05 MHz due to field drift
04/07/2005 Replaced two blown fuses in BSMS unit
04/27/2006 Power supply for BLAH 100 amplifier exchanged
7/10/2006 Replaced fans for BLAX-300 amplifier
08/14/2006 Exchange Power supplies for BLAH100 and BLARX300
09/19/2007 Acustar Gradient Unit down
09/23/2007 Acustar working again